Søndersø WWTP (Denmark)

PILOT OVERVIEW
LOCATION
THE PILOT
  • CAS WWTP built in 1990
  • Designed for 20,000 P.E.
  • It receives a large quantity of organic load, increasing the aeration/nutrient removal need
  • Estimated 4 overflow events discharging 6.000 m³ of untreated SWOs/year

DEMONSTRATION ACTIONS

MABR Reactor

Design and integration of a MABR Reactor with 12 Units, treating up to 40 kg N/d (20% of the nitrogen load), improving the effluent quality and increasing its overall capacity by 20% (720 m³/d.

SWTM

Design and integration of a SWTM based on mechanical filtration with a capacity of up to 600 m³/h.

SiiMS

Implementation of the SiiMS, using data from existing CSN sensors, monitoring the dynamics affecting the WWTP operation and validation of the (I/I) models.